Gnarwarre Battery Energy Storage System
We power the
future, now
Experienced renewable energy developers, FRV, are developing a new source of sustainable energy storage near Geelong, Victoria.
Welcome to
Gnarwarre Battery Energy Storage System
The Gnarwarre Battery Energy Storage System is a renewable energy project by FRV Services Australia (FRV). The project is currently in the construction phase.
Site Selection
Preliminary Investigations
Prepare Development Application
Planning Assessment
Prepare for Construction
Construction
Operation
Key Benefits

Grid Capacity and Reliability
Enough capacity for 250 MW of storage over 2 hours. Grid firming and reliability during network disruptions.

Reduce Emissions
Increasing the capacity for electricity generated from intermittent renewable sources such as solar and wind.

Create Jobs
Up to 50 construction jobs and contribute to 2 ongoing local jobs after completion.
The Gnarwarre BESS project will use state-of-the-art battery technology, allowing for safe and effective energy storage

This project will have a total discharge capacity of 250 megawatts and a storage capacity of 2-hours allowing for continuous energy injection during times of heightened demand.
The utility-scale battery will use incorporate the latest technology including grid forming inverters and fire detection and prevention equipment.

The project will involve a small operational footprint and will be setback from surrounding roads and residences. The design will integrated with the existing topography to ensure impacts are minimised.

Location
Located on private land within the Surf Coast Shire Local Government Area (Wadawurrung Country). The project will connect to the existing overhead transmission line through construction of a switching yard.

Planning Process
The project has obtained approval by planning permit as is currently under construction.

Community Benefits
The project would involve a suite of community benefits during construction and operation.